What happens after you sign with a builder, and where an independent inspector can save you trouble.
1. Contract and deposits
After you sign, you will typically pay an initial deposit and then further deposits at set milestones like design selections. Confirm in writing which deposits are refundable.
2. Design selections
You choose finishes and options, often at a design center. Keep your own copy of every selection and its price.
3. Construction and inspections
Ask whether you can have an independent inspector visit at key stages, for example before drywall when framing, wiring and plumbing are still visible. Builders do their own inspections and the county inspects too, but a buyer’s inspector works for you.
4. Financing
Lock in your loan terms and watch the expiration date on any rate lock, since construction delays can push closing past it. Ask the lender what happens if the date moves.
5. Final walkthrough
Also called the orientation. Go through the home with the builder’s representative and list every issue, such as paint, scratches, doors and fixtures that do not work. Take photos and get the list in writing.
6. Closing and the first year
After closing, keep track of warranty deadlines and submit issues in writing. Many problems show up in the first few months, such as drywall settling, so keep a running list.
Need a second set of eyes?
I can walk the final orientation with you or recommend independent inspectors. Call or text 904-661-6131.
Stina Antonopoulos, Managing Broker, Augustina Realty. Call or text 904-661-6131.
This article is general information, not legal, tax or financial advice. Community details, fees and incentives change; verify with the builder, lender and county. Augustina Realty Inc. is an equal housing opportunity business.


Leave a Reply